Timber Frame

Following several months of coordination with the timber frame manufacturer, this new-build project is finally bursting into life. The prefabricated elements are hoisted in to place with a telehandler; a process that produces a weather tight shell in a mere

Ground preparations

A reduced level dig is underway at this site in Buckinghamshire to prepare the way for the installation of the timber frame, our client’s chosen construction method. Once the insulating slab has been cast the core structure of the frame

|