We are very excited about this project and seeing it start on site. These photos show enabling works getting underway. Nothing is going to waste (apart from an asbestos roof). The frames of the two main barns have been stripped, then cleaned, stiffened and strengthened. The existing concrete slab has been levelled ready for the pre-cut timber frame to be erected.
Timber cladding, concrete block and precast concrete planks that have been removed from the original building are being stripped and stored in preparation for re-use during construction.
Watch this space!