vh-featured

The Vine House

This grade 2 listed house that had been heavily altered and adapted in the 1970’s with a poor quality 1980’s conservatory, too cold in winter too hot in summer. Re–imagining the stair arrangement created a vertical space linking the 3

VineHouseHB&Rsm

The Vine House in HB&R

A full case study of our project, The Vine House features in the March issue of Homebuilding & Renovating magazine.  On the shelves now!

|